AV and Lighting Installation at Gulliver's Warrington

Stream7 designed and installed a complete theatre AV and lighting system at Gulliver's Warrington, combining a large LED wall, bespoke rigging, new lighting and integrated show control.
  • Client
  • Gulliver's Theme Park Resorts
  • Sector
  • Entertainment
  • Services
  • Event Production
  • Year
  • 2026
About Project

Bringing a New Theatre to Life

When Gulliver's Theme Park Resort developed a brand-new theatre space at its Warrington attraction, the team turned to Stream7 to help bring the technical elements of the venue to life.

Having worked with Gulliver's on previous projects, we already had a great relationship with the team and an understanding of the requirements of a busy family entertainment venue.

The brief was to make the most of the existing AV equipment while introducing new lighting, rigging and control systems to create a professional, flexible theatre space ready for the busy Christmas season.

From detailed CAD designs and structural considerations to lighting installation and audio integration, our team worked alongside multiple contractors to deliver a complete technical setup.

Solution

Designing an AV System for a Brand-New Theatre

Moving existing equipment into a new venue isn't always as straightforward as it sounds.

The new theatre had a different layout and infrastructure, meaning the existing LED screen and sound system needed to be carefully integrated into the space alongside a brand-new lighting installation.

Rather than simply installing equipment where it would fit, we approached the project from a design perspective, considering sightlines, positioning, weight loading and how the different technical systems would work together.

Using CAD software, our team designed a bespoke rigging solution to accommodate the existing 6.5m x 3.5m LED wall within the new theatre.

We also developed the design for a new lighting rig, calculating the required rigging arrangements and weight loads to ensure the proposed installation was suitable for the venue.

This planning stage was essential in making sure the equipment could be installed efficiently and function as intended once the theatre was operational.

Working Around a Busy Theme Park Environment

One of the biggest challenges was coordinating the installation alongside the wider construction and fit-out of the new theatre.

With multiple teams working on different elements of the project, including electricians, carpenters, air conditioning contractors and health and safety personnel, careful scheduling and communication were essential.

The installation was delivered across multiple phases, with our team working closely with the other contractors and the Gulliver's team to ensure each stage could progress without disrupting other work.

As the theatre was being developed within an operational theme park, we also needed to plan work around quieter periods to minimise disruption to the attraction and its visitors.

This collaborative approach allowed us to adapt to the changing requirements of the space as the wider project progressed.

New Theatre Lighting and Professional AV Installation

The technical installation combined existing equipment with new additions, creating a complete audio, visual and lighting system for the theatre.

A key part of the upgrade was the installation of new profile lighting fixtures, providing greater flexibility and control over how performances could be lit.

Alongside the new lighting rig, we installed the existing LED wall within its newly designed rigging system and reinstalled the venue's PA system.

The sound system was then tuned specifically for the acoustics of the new theatre, helping to ensure clear, balanced audio throughout the performance space.

The installation included:

  • 6.5m x 3.5m LED wall installation

  • Bespoke CAD-designed rigging system

  • New theatre lighting rig with profile fixtures

  • Rigging design and weight-loading calculations

  • Reinstallation of the existing PA system

  • Audio system tuning for the new venue

  • Integrated show control using QLab

By reusing suitable existing equipment alongside carefully selected upgrades, we were able to create a modern technical setup without unnecessarily replacing systems that were already fit for purpose.

Bringing Sound, Lighting and Video Together with QLab

One of the most important elements of the project was ensuring the theatre's different technical systems could work together seamlessly.

The complete show system was integrated using QLab, allowing audio, lighting and visual content to be synchronised and controlled through a central show-control workflow.

For a busy entertainment venue, this offers a significant practical advantage.

Rather than requiring separate operators to manage every element of a performance, the system allows authorised performers or staff on stage to trigger pre-programmed cues.

This means music, sound effects, lighting changes and screen content can be coordinated as part of a single show sequence.

It creates a more consistent experience for audiences while making the technical operation of performances simpler for the Gulliver's team.

For venues running repeated performances throughout the day, having an intuitive and reliable control system can make a real difference to day-to-day operations.

Why CAD Design Matters for Permanent AV Installations

Projects like this highlight the importance of detailed technical design before any equipment is installed.

When working with large LED screens, overhead lighting and rigging systems, it's essential to understand how everything will fit within the space and how the installation will be supported.

CAD design allows us to visualise the proposed setup, plan equipment positioning and identify potential issues before arriving on site.

For the Gulliver's theatre, it also helped us coordinate with the other contractors involved in developing the venue.

By considering the technical requirements early in the process, we could design an installation that worked with the building rather than trying to adapt everything once construction was complete.

It's an approach we use across our event production, exhibition and permanent AV installation projects, helping clients understand exactly what they're getting before work begins.

Outcome

Ready for the Christmas Season

The completed installation helped transform the new theatre into a welcoming, fully equipped performance space ready for Gulliver's busy Christmas programme.

With its large LED wall, new theatrical lighting, tuned sound system and integrated show control, the venue now has a flexible technical setup designed to support its live entertainment.

It was also another opportunity to build on our long-standing relationship with the Gulliver's team, working collaboratively to deliver a solution that suited their venue, performers and audiences.

And as an added bonus, our team even got to stay in one of Gulliver's pirate-themed rooms during the project - certainly a change from the usual hotel accommodation!

AV Installation and Technical Design for Entertainment Venues

Whether it's a brand-new theatre, an existing performance space or a visitor attraction looking to upgrade its technical capabilities, successful AV installation starts with understanding how the venue will actually be used.

From CAD design and rigging calculations to lighting, sound, LED screens and integrated show control, Stream7 can support the planning, installation and integration of technical systems for a wide range of spaces.

For Gulliver's Warrington, that meant bringing together existing equipment and new technology to create a practical, professional theatre environment ready to entertain visitors for years to come.

Need help with an install? Get In Touch
Showcase Projects
Rowan Campbell-Pilling GB3 Car Launch Event Production
Rowan Campbell-Pilling GB3 Car Launch Event Production
view case study
Filming Kids Invent Stuff's Rube Goldberg Machine in London
Filming Kids Invent Stuff's Rube Goldberg Machine in London
view case study
Concert Live Stream in Sheffield
Concert Live Stream in Sheffield
view case study
View All Projects